MVP Ready
    MVP Ready
Toggle navigation
  • PAV VIEWER
  • NOTICE
  • UPLOAD
    • UPLOAD
    • UPLOAD STATUS BY SURVEYOR
    • UPLOAD STATUS BY DEPARTMENT
  • ADMIN
    • VERIFICATION
    • CATEGORY MANAGEMENT
    • ADMIN MANAGEMENT

Recent Uploads More

A / V Material Title / ShipType / Description Category ShipAge Date
Gallery Image
Documents for interim audit
   
   When conducting the three interim Audits (ISM, MLC, ISPS) for newbuilding deliveries, it is helpful to send the attached files to the ship manager in advance. This facilitates a smoother Audit process.
AUDIT 2025-11-06
Gallery Image
Case study - ISM NC Finding
   CARGO SHIP
   Case study - ISM code 9, prevent recurrence
AUDIT 18 2025-11-04
Gallery Image
Sidelight Angle confirmation Inspection
   BULK CARRIER
   This report is subjected to confirm the sidelight arrangements whether the ship is complied with the requirement of COLREG Annex I,9(a)(i).

COLREG Annex I,9(a)(i)
In the forward direction, sidelights as fitted on the vessel shall show the minimum required intensities. The intensities shall decrease to reach practical cut-off between 1 degree and 3 degrees outside the prescribed sectors

In response to potential requests from the shipowner, a report template has been attached to ensure that photo and other results from the sidelights angle confirmation inspection can be retained onboard for Port State Control (PSC) compliance purposes.
STA MODULE 2025-11-03

Notice More

Subject Date Hit
[Notice] Request for Survey/Audit related Pictures & Videos upload to KR-PAV 2019-03-26 267
[Notice] KR-PAV operation in 2017 2018-04-17 129
[Notice] Request for Survey/Audit related pictures & videos upload to KR-PAV 2018-04-17 699
[Notice] What is KR-PAV ? 2018-03-28 255
[Notice] KR-PAV operation in 2016 2017-04-20 264

Top Uploaders  [2025] More

SEO Bohwan 5
GU Jungho 5
OH Changwon 2
YU Gang 2
VAN Heanho 2

36, Myeongji ocean city 9-ro, Gangseo-gu, Busan, 46762 Republic of Korea. | Copyright © KR PAV (Education Team) All rights reserved.