MVP Ready
    MVP Ready
Toggle navigation
  • PAV VIEWER
  • NOTICE
  • UPLOAD
    • UPLOAD
    • UPLOAD STATUS BY SURVEYOR
    • UPLOAD STATUS BY DEPARTMENT
  • ADMIN
    • VERIFICATION
    • CATEGORY MANAGEMENT
    • ADMIN MANAGEMENT

Recent Uploads More

A / V Material Title / ShipType / Description Category ShipAge Date
Gallery Image
Case study - Changed warning notice(Noise)
   
   7.4 Warning notices
Where the noise level in machinery spaces (or other spaces) is greater than 85 dB(A), entrances to such spaces shall carry a warning notice comprising symbol and supplementary sign in the working language of the ship as prescribed by the Administration
STA MODULE 2026-06-10
Gallery Image
Mooring Trial
   
   This information pertains to the overall mooring trial. Please refer to it for your reference.
MACH MODULE 2026-06-09
Gallery Image
Structural fracture of trans. BHD of Bulk Carrier
   BULK CARRIER 'ESP'
   Damage of transverse bulkhead under lower stool
- Position : Between No.3 D.B. WBT and No.4 D.B. WBT
Fillet welding joint between trans. BHD and inner bottom plate
HULL DAMAGE & REPAIR 2026-06-08

Notice More

Subject Date Hit
[Notice] Request for Survey/Audit related Pictures & Videos upload to KR-PAV 2019-03-26 292
[Notice] KR-PAV operation in 2017 2018-04-17 129
[Notice] Request for Survey/Audit related pictures & videos upload to KR-PAV 2018-04-17 768
[Notice] What is KR-PAV ? 2018-03-28 268
[Notice] KR-PAV operation in 2016 2017-04-20 303

Top Uploaders  [2026] More

KANG Jeongsuk 2
LEE Sanghun 2
CHO Samyon 2
KIM Hyunjung 1
JUNG Uijeong 1

36, Myeongji ocean city 9-ro, Gangseo-gu, Busan, 46762 Republic of Korea. | Copyright © KR PAV (Education Team) All rights reserved.